This paper details the first response to an emergency incident that took place at Ulley Reservoir in June 2007, and provides a first hand account of the events that took place during the initial twelve hours and looks at the actions taken by the Undertaker, Rotherham Metropolitan Borough Council (RMBC), and the Supervising Engineer during that period. The paper also provides a commentary on the actions taken by the AR Panel Engineer, the emergency services and Undertaker's and contractor's staff in carrying out further emergency works to stabilise the dam during the following 48 hours. It provides a detailed account of an emergency plan being put into action and also how the emergency plan can be flexible enough to allow improvisation to deal with particular problems as they are identified. The paper concludes by providing a summary of the main lessons learnt during the emergency response and comments on general housekeeping matters such as the availability of reservoir records, communications and welfare facilities.
机译:本文详细介绍了2007年6月在Ulley水库发生的紧急事件的第一反应,并提供了最初十二个小时内发生的事件的第一手资料,并介绍了承办商罗瑟勒姆都会区采取的行动理事会(RMBC)和该时期的监理工程师。本文还对AR小组工程师,紧急服务以及承办方和承包商的员工在接下来的48小时内进行进一步的紧急工程以稳定大坝所采取的行动提供了评论。它详细说明了正在实施的应急计划,以及应急计划如何足够灵活以允许即席处理发现的特定问题。本文最后总结了在应急响应过程中获得的主要经验教训,并对一般的内务管理事项(例如水库记录的可用性,通讯和福利设施)进行了评论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号