首页> 外文会议>Engineers Society of Western Pennsylvania Annual International Bridge Conference; 20070604-06; Pittsburgh,PA(US) >Demolition Study of 300-ft Truss Incorporated in Bridge Replacement Bid Documents
【24h】

Demolition Study of 300-ft Truss Incorporated in Bridge Replacement Bid Documents

机译:纳入桥梁换标文件的300英尺桁架的拆除研究

获取原文
获取原文并翻译 | 示例

摘要

To alert prospective bidders of anticipated demolition complexity, reduce bid risk, and minimize the potential for related claims during construction, a study for dismantling a 300-foot truss over the Mahoning River and two active railroad bridges in proximity of high-voltage transmission lines was incorporated in the bridge replacement bid documents including one feasible demolition scheme with crane sizes, configurations, positions, picks, clearances, and shoring/causeway locations.
机译:为了提醒潜在的投标人预期的拆除复杂性,降低投标风险并最大程度地减少施工过程中相关索赔的可能性,一项关于拆除马洪宁河上300英尺桁架和高压输电线路附近的两座现役铁路桥的研究是包含在桥梁更换投标文件中,包括一种可行的拆除方案,其中包括起重机的尺寸,配置,位置,镐,间隙和支护/铜道位置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号