Replacing the MLK Street Bascule Bridge Toledo, Ohio

机译:替换俄亥俄州托莱多的MLK街前桥

获取原文
获取原文并翻译 | 示例

摘要

Faced with the decision of performing an extensive renovation or a technically challenging replacement of a deteriorated 216 foot steel girder bascule bridge while minimizing interruptions to vehicular and pedestrian traffic over the Maumee River as well as navigational traffic on the Maumee River, the City of Toledo, Ohio opted for the most cost efficient alternative; replacement of the bridge. To replace the existing bridge would require the removal of four delicately balanced steel bascule leaves followed by the staged installation of four new steel bascule frames and counterweight concrete; all performed over the Maumee River; all planned to fit within a extremely tight 3-month time period. This paper will present the innovative erection process developed to carefully choreograph the use of two large deck barges, eight heavy duty self-propelled modular transports (SPMT's), erection gantries, lifting towers and auxiliary counterweights. The erection process would require the equipment to lift each existing bascule leaf from its rolling track, transfer the load to mobile transports positioned on the barges, float the leaf out to a nearby staging area and move the leaf onto the shore where it would be demolished. Once two pairs of existing leaves were removed and all pier modifications were complete, the erection process would require each new pre-erected bascule leaf to be lifted onto the mobile transports, rolled onto the barge, floated to the bridge site, lowered onto new track frames and then balanced with new heavy-weight counterweight concrete.
机译:面临对破旧的216英尺钢制大梁启蒙桥进行大规模翻新或更换技术上具有挑战性的决定,同时最大程度地减少了对莫梅河上的车辆和行人交通以及托莱多市莫梅河上的航行交通的干扰,俄亥俄州选择了最具成本效益的替代方案。更换桥梁。要更换现有的桥梁,将需要拆除四个细微平衡的钢制安全气囊叶片,然后分阶段安装四个新的钢制安全气囊框架和配重混凝土;全部在莫米河上表演;所有这些都计划在非常紧张的3个月内完成。本文将介绍创新的安装过程,该过程旨在精心编排使用两个大型甲板驳船,八个重型自行式模块化运输工具(SPMT's),安装门架,升降塔和辅助配重的设计。架设过程将需要设备从其滚动轨道上抬起每个现有的伞形叶片,将负载转移至位于驳船上的移动运输工具,将叶片漂浮到附近的临时区域,然后将叶片移至将要拆除的海岸上。一旦去除了两对现有的叶子并且完成了所有的码头修改,则安装过程将需要将每块新预先竖立的伞形叶子举到移动运输工具上,卷到驳船上,漂浮到桥上,再降到新轨道上框架,然后与新型的重配重混凝土平衡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号