Varied Foundations for a Fast Track Bridge Replacement

机译:快速通道桥梁更换的各种基础

获取原文
获取原文并翻译 | 示例

摘要

The Victory Bridge Replacement project in Perth Amboy, NJ was schedule driven. A previous design-build (D/B) contract for the new bridge was terminated with foundations partially in-place. The new design team was charged to meet an expedited schedule to get the project back on track. The entire time span from design contract award to completion of the bridge was four years. The geologic conditions and constructibility issues for the replacement (a high-level 3,971 ft long precast segmental concrete structure) required the use of varying deep foundation types and ground improvement methods to save time and money. The foundations for the structure were varied to make use of foundations installed by the D/B contractor, as well as to shorten the time to construct the substructure. The foundations were 24 in. dia. pipe piles for the land piers and 6 and 8-ft dia. drilled shafts for the water piers. The drilled shafts (up to 120 ft long) were socketed into bedrock to resist large lateral loads due to seismic events and vessel impact.
机译:新泽西州珀斯安博伊市的胜利桥更换项目按计划进行。新桥的先前设计建造(D / B)合同因基础已就位而终止。新的设计团队要负责加快进度,以使项目重回正轨。从设计合同授予到桥梁竣工的整个时间为四年。替换的地质条件和可施工性问题(高3,971英尺长的预制分段混凝土结构)要求使用各种深层基础类型和地面改良方法,以节省时间和金钱。该结构的基础有所不同,以利用D / B承包商安装的基础,并缩短了构造子结构的时间。地基直径为24英寸。陆地码头和直径为6和8英尺的管桩。水墩的钻孔轴。将钻好的竖井(最长120英尺)装在基岩中,以抵抗地震和船只撞击造成的较大横向载荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号