首页> 外文会议>Energy in the city >Advances in Rooftop Wind Turbines and their Installation to Reduce Noise and Vibration Issues
【24h】

Advances in Rooftop Wind Turbines and their Installation to Reduce Noise and Vibration Issues

机译:屋顶风力发电机及其安装的最新进展,以减少噪音和振动问题

获取原文
获取原文并翻译 | 示例

摘要

Elephant and Castle is undergoing urban regeneration, 40 hectares will be redeveloped between 2006 and 2018. This part of the project was designed to establish which type of urban wind turbine is most effective, whilst minimizing the effect on the residents and community. As an experimental site an 11 storey concrete residential building was selected for a pilot study. The first urbine (an urban wind turbine), a Proven 6 kW turbine, was installed in June 2007; the second, a Quiet Revolution 5 was installed in June 2008. The urbines were installed on condition that a noise and vibration report covering the initial three months was acceptable to Southwark Council. Monitoring was undertaken on the rooftop and in an unused flat directly beneath the primary turbine. In addition, wind, weather and electricity produced were recorded for the period June 2008-Feb 2010 [1,2,3].
机译:Elephant and Castle正在进行城市复兴,2006年至2018年将重新开发40公顷。项目的这一部分旨在确定哪种类型的城市风力发电机最有效,同时最大程度地减少对居民和社区的影响。作为实验场所,选择了一座11层高的混凝土住宅楼进行试点研究。 2007年6月安装了第一台涡轮机(城市风力涡轮机),这是一种经过验证的6 kW涡轮机;第二个是在2008年6月安装了Quiet Revolution5。在安装了最初三个月的噪声和振动报告的情况下,Southwark Council才接受安装这种涡轮机。在屋顶和主涡轮机正下方未使用的公寓中进行监控。此外,记录了2008年6月至2010年2月的风,天气和电力[1,2,3]。

著录项

  • 来源
    《Energy in the city》|2010年|p.91-94|共4页
  • 会议地点 London(GB)
  • 作者单位

    Acoustics Group, FESBE, London South Bank University, Borough Road, London SE10AA;

    Acoustics Group, FESBE, London South Bank University, Borough Road, London SE10AA;

    Capita Symonds, 4th Floor, 86 Fetter Lane, London EC4A 1 EN;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 太阳能技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号