首页> 外文会议>Eleventh International Conference amp; Exhibition on Liquefied Natural Gas Birmingham, United Kingdom 3-6 July 1995 >Cold box applciation for adgas third lng train L'application de 'boite froide' pour le troisieme train de gnl a adgas
【24h】

Cold box applciation for adgas third lng train L'application de 'boite froide' pour le troisieme train de gnl a adgas

机译:阿德加斯第三轻轨列车的冷箱应用克洛尔到阿加斯的第三列火车的“冷箱”应用

获取原文
获取原文并翻译 | 示例

摘要

The ADGAS 3~rd Train is the worlds biggest LNG train in operation with a design capacity of 2.5 MTA of LNG plus 0.5 MTA of LPG. Unlike most LNG plants the feed gas is a combination of assoicated gas from oil production and lena gas from gas wells. The plant is therefore designed to process a wide range of feed stocks. The basic liquefaction is carried otu by the APCI propane pre-cooled mixed refrigerant process.
机译:ADGAS 3rd火车是世界上运行的最大LNG火车,设计能力为2.5 MTA的LNG加0.5 MTA的LPG。与大多数液化天然气工厂不同,进料气是石油生产中的伴生气与气井中的莲娜气的混合物。因此,该工厂旨在处理多种原料。基本液化是通过APCI丙烷预冷混合制冷剂工艺完成的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号