The North West Shelf Gas Project (NWSGP) has successfully carried out a 3 Train LNG plant debottlenecking to increase capacity from 6.9 to mroe than 7.5 million tonnes per annum. The two major constraints targeted by the project were the CO2 removal column and the main refrigerant compressor drivers. Replacement of the original trays by structured packing in the Sulfinol absorber columns and a change of solvent composition has cured foaming problems and increased gas-treating capacity. The installation of advanced technology parts (ATP) has effectively uprated the gas turbine drivers of the refrigerant compressors from GE Frame 5B to 5C. An increase in turbine power of 9
机译:西北大陆架天然气项目(NWSGP)已成功进行了3列火车LNG工厂的瓶颈改造,将产能从6.9吨/年提高到750万吨/年以上。该项目针对的两个主要限制因素是二氧化碳去除塔和主要的制冷压缩机驱动器。通过在Sulfinol吸收塔中进行结构填充来替换原始塔板,并改变溶剂组成,已解决了发泡问题,并提高了气体处理能力。先进技术零件(ATP)的安装有效地将制冷剂压缩机的燃气轮机驱动器从GE Frame 5B升级到5C。涡轮功率增加9

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号