【24h】

Water And Ice Control In The Anton Anderson Memorial Tunnel, Whittier, Alaska

机译:阿拉斯加惠提尔安东·安德森纪念隧道的水和冰控制

获取原文
获取原文并翻译 | 示例

摘要

Recently converted to a dual use highway/railroad tunnel, the 4.0 km Anton Anderson Memorial Tunnel in south central Alaska provided more than its share of water- and ice-related problems to the design/build contractor. Previously, water inflows and associated ice build-up had been significant maintenance tasks for the Alaska Railroad in winter months. There had also been on-going degradation of the track structure due to frost heaving and the effects of water and ice. On June 7, 2000, the converted tunnel was opened to the public with a new roadway structure and an active ice control system. This paper details the approach and solution to the problem of ice build-up.
机译:阿拉斯加中南部4.0公里长的安东·安德森纪念隧道(Anton Anderson Memorial Tunnel)最近转变为公路和铁路两用隧道,为设计/建造承包商提供了更多与水和冰有关的问题。以前,进水和相关的积冰是阿拉斯加铁路在冬季的重要维护任务。由于霜冻起伏以及水和冰的影响,轨道结构也正在持续退化。 2000年6月7日,改建后的隧道以新的道路结构和有效的防冰系统向公众开放。本文详细介绍了结冰问题的解决方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号