首页> 美国政府科技报告 >Evaluation of the Train Signal and Rail Systems for the Anton Anderson Memorial Tunnel
【24h】

Evaluation of the Train Signal and Rail Systems for the Anton Anderson Memorial Tunnel

机译:安东·安德森纪念隧道列车信号和轨道系统评估

获取原文

摘要

In June 2000, the State of Alaska Department of Transportation and Public Facilities (DOT/PF) completed construction of the Whittier Access Project. One phase of this project converted the existing 2.5-mile Anton Anderson Memorial Railroad Tunnel (or Whittier Tunnel) into the world's only dual-use highway/rail tunnel with one-way reversible highway traffic. The construction project included construction of the tunnel invert (driving surface that can accommodate both highway vehicles and trains); drainage systems; three different types of ventilation systems; two vehicle staging areas; Tunnel Control Center (TCC); communication systems; portal buildings; train signal system and other safety features. The primary objective of this research project is to: 1) identify the problems affecting the train signal and rail systems and 2) develop the Scope of Services for an engineering consultant contract to determine the causes of the train signal system failures and develop solutions.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号