【24h】

Controlled blasting methods for excavating rock and concrete near critical structures

机译:在关键建筑物附近开挖岩石和混凝土的控制爆破方法

获取原文
获取原文并翻译 | 示例

摘要

In construction and mining work, situations occasionally occur where hard rock or concrete must be excavated at locations near critical structures or utilities. Fearing damage from blasting, contractors and engineers often explore the viability of using mechanical methods or expansive concrete to facilitate the excavation work. In some cases, the high cost and slow progress rates associated with alternate methods or other limiting conditions, makes the use of these methods impractical. In these situations, controlled blasting methods can be efficiently used if properly designed and managed. This paper describes and demonstrates methods for determining the feasibility of high risk blasting work and outlines methods used to manage their design and execution to ensure successful results.
机译:在建筑和采矿工作中,偶尔会发生必须在关键结构或公用设施附近挖硬岩或混凝土的情况。由于受到爆破的恐惧,承包商和工程师经常探索使用机械方法或膨胀混凝土来促进开挖工作的可行性。在某些情况下,与替代方法或其他限​​制条件相关的高成本和缓慢进度使得使用这些方法不切实际。在这些情况下,如果设计和管理得当,可以有效地使用控制爆破方法。本文描述并演示了确定高风险爆破工作可行性的方法,并概述了用于管理其设计和执行以确保成功的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号