EPR Hazard – Time to Tackle the Hard Issues?

机译:EPR危害–是时候解决难题了吗?

获取原文

摘要

The fundamental problem discussed by this paper is how NZ should handle EPR situationswith:1. very high EPR (typically > 4kV)2. a very low probability of a hazardous EPR event occurring at any one site3. a very large number of sites (typically > 10,000).If these general types of situations were to be considered an “unacceptable risk” (due to theirvery high EPR levels), the cost of mitigating them would be huge.This paper provides a summary of “how big” current EPR problems are at the locations ofvarious different types of power network plant in NZ. The two potentially “biggest” types ofEPR problems in NZ are identified as:1. concrete power poles, steel power poles, steel power pylons2. rural distribution transformers.The applicable EPR hazard voltage limits in NZ and Europe are discussed, together with therelevant European standards. Differences between European and NZ power systems areoutlined, and used to explain why the European standards are inappropriate for “unqualified”use in NZ.Proposed changes to the current NZ EPR hazard voltages are explained. In particular, theneed for a general Risk Study for each of the:(1) concrete power poles/steel power poles/steel power pylons, and(2) rural distribution transformerssituations is advocated, to determine the best strategy for addressing these situations. Theserisk studies will not only attempt to broadly quantify the risk, but also identify the major riskfactors that make the risk at some locations much worse. This should enable the worstlocations, at the very least, to be identified and addressed.
机译:本文讨论的根本问题是新西兰应如何处理EPR情况:1.。 EPR很高(通常> 4kV)2。在任何一个地点发生危险的EPR事件的可能性极低3。数量众多的站点(通常> 10,000)。如果将这些一般类型的情况视为“不可接受的风险”(由于它们的EPR水平很高),那么减轻这些损失的成本将是巨大的。本文提供了总结当前“有多大” EPR问题出现在新西兰各种不同类型的电网工厂。新西兰有两种潜在的“最大” EPR问题类型:1。混凝土电线杆,钢制电线杆,钢制电力塔2。讨论了在新西兰和欧洲适用的EPR危险电压限值,以及相关的欧洲标准。概述了欧洲和新西兰电力系统之间的差异,并用于解释为什么欧洲标准不适合在新西兰“不合格”使用。解释了当前NZ EPR危险电压的拟议变更。特别是,需要对以下各项进行一般风险研究:(1)混凝土电线杆/钢制电线杆/钢制电力塔,以及(2)农村配电变压器,以确定解决这些情况的最佳策略。这些风险研究将不仅试图广泛地量化风险,而且还将找出使某些地区的风险更加恶化的主要风险因素。这应该至少能够识别和解决最差的位置。

著录项

  • 来源
  • 会议地点 Christchurch(NZ)
  • 作者

    Alan Marshall;

  • 作者单位

    Senior Electrical Engineer (Lightning Power Protection)Opus International Consultants LtdPO Box 1482Christchurch Ph: 0-3-363 5537Fax: 0-3-365 7858Email: alan.marshall@opus.co.nz;

  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号