The North Mercer Island Interceptor and Enatai Interceptor Upgrade Project (henceforth the North Mercer Enatai Project) is a large conveyance upgrade project for King County, in Seattle, WA. The project includes the upgrade of a pump station on Mercer Island and open cut pipeline, crossing of the East Channel of Lake Washington, and the installation of a 36-inch HDD beneath Enatai hillside to convey flows to the Sweyolocken Pump Station located in South Bellevue. The HDD is designed in complex geotechnical conditions that include recessional outwash with zones of large gravel and small cobbles. More challenging than the site geology is the layout of the bore which begins within the Washington State Department of Transportation (WSDOT) ROW parallel to the Interstate-90 (I-90) Bridge where it crosses Lake Washington, as seen in Figure 1. This segment of I-90 is extremely sensitive due to very soft soils at the foundation that have resulted in movement of the foundation piles for the bridge. These circumstances resulted in extensive coordination with WSDOT and the requirement for a specialty HDD analysis showing the area of influence around the HDD and the potential impacts to the I-90 bridge piles. In addition, the coordination with WSDOT addressed the installation of the HDD beneath I-90 on and off ramps on the east end of the bore. This paper will focus on the project factors that led to the choice of using trenchless techniques, the selection of the preferred trenchless method, and the specialty analysis that was required by the governing agencies to get approval for construction within a Federal Highway ROW.
机译:北部默瑟岛拦截器和Enatai拦截器升级项目(以下称为“北部默瑟恩塔特”项目)是华盛顿州金县的大型运输工具升级项目。该项目包括升级默瑟岛上的泵站和明挖管线,穿越华盛顿湖东通道,以及在Enatai山坡下安装36英寸硬盘驱动器,以将水流输送到南贝尔维尤的Sweyolocken泵站。 。 HDD是在复杂的岩土条件下设计的,包括具有大砾石和小鹅卵石区域的后退冲刷。比站点地质更具挑战性的是钻孔的布局,该布局从华盛顿州交通运输部(WSDOT)ROW内开始,平行于90州际公路(I-90)桥穿越华盛顿湖,如图1所示。 I-90的一段非常敏感,原因是基础上的土壤很软,导致桥梁的基础桩运动。这些情况导致了与WSDOT的广泛协调,并要求进行专门的硬盘分析,以显示硬盘周围的影响区域以及对I-90桥桩的潜在影响。此外,与WSDOT的协调解决了在孔的东端在I-90下方和上下坡道上安装HDD的问题。本文将重点关注导致选择使用非开挖技术的项目因素,首选的非开挖方法的选择以及理事机构获得联邦高速公路ROW内建设批准所需的专业分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号