首页> 外文会议>Decommissioning, decontamination, and reutilization topical meeting 2010 >Building 18: Operating Feedback from Cleaning and Dismantling of Glove Boxes and Shielding Lines
【24h】

Building 18: Operating Feedback from Cleaning and Dismantling of Glove Boxes and Shielding Lines

机译:建筑18:清洁和拆卸手套箱和屏蔽线的操作反馈

获取原文
获取原文并翻译 | 示例

摘要

The Atomic Energy Commission's centre at Fontenay Aux Roses (CEA-FAR) was created in 1946. A radiochemical laboratory devoted to R&D programs focused on studies of irradiated fuel reprocessing processes, waste treatment processes and studies and production of transuranic elements was built in the early 1960s. The R&D program was finally halted on 30 June 1995[l-2]. The purpose of the building 18 clean-up program is to minimise the nuclear and conventional hazards and to reduce as much as possible the production of HLW and MLW during subsequent dismantling work [2]. The paper will deal with a short description of the operations as well as the lessons learned.
机译:原子能委员会位于Fontenay Aux Roses(CEA-FAR)的中心成立于1946年。早期建立了一个专门从事R&D计划的放射性化学实验室,重点研究辐照燃料的后处理过程,废物处理过程以及超铀元素的研究和生产1960年代。研发计划最终于1995年6月30日终止[1-2]。建筑物18清理计划的目的是最大程度地减少核危害和常规危害,并在随后的拆除工作中尽可能减少HLW和MLW的生产[2]。本文将简要介绍操作以及所汲取的教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号