Renovation of an existing coal-fired power plant to a natural gas-fired combined cycle power plant in China

机译:将中国现有的燃煤电厂改造为天然气联合循环电厂

获取原文
获取原文并翻译 | 示例

摘要

In China, environmental pollution caused by emissions from coal-fired power plant is getting worse. For reduction this environmental pollution, gas turbine (GT) generation system firing natural gas (NG) is effective. Plans such as construction of new combined cycle power plant (CCPP) system using GT and renovation of the existing old power plant to CCPP system are becoming common. And especially the renovation of old power plant to CCPP is more economical and practical than construction of new CCPP. In this renovation scheme, existing boiler(s) are dismantled and new GT(s) coupled with heat recovery steam generator (HRSG)(s) are installed to combine with existing steam turbine (ST)(s). It is suitable to apply a compact size 25,000 kW class GT (H-25) for installing GTs in existing power plant with great flexibility. As a result of feasibility study for the renovation of old power plant to CCPP, higher overall plant thermal efficiency, increased of total electrical output, lower CO_2 and NO_x emissions and large effect are confirmed.
机译:在中国,燃煤电厂排放造成的环境污染日益严重。为了减少这种环境污染,燃烧天然气(NG)的燃气轮机(GT)发电系统是有效的。诸如使用GT建造新的联合循环电厂(CCPP)系统以及将现有的旧电厂改造为CCPP系统之类的计划正变得越来越普遍。特别是将旧电厂改建为CCPP比建造新的CCPP更经济,更实用。在此改造方案中,拆除了现有锅炉,并安装了带有热回收蒸汽发生器(HRSG)的新GT,以与现有蒸汽轮机(ST)结合使用。适用于紧凑型25,000 kW GT(H-25)的安装,以便在现有电厂中以极大的灵活性安装GT。通过对老电厂进行CCPP改造的可行性研究的结果,证实了更高的电厂总体热效率,总电力输出的增加,更低的CO_2和NO_x排放以及巨大的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号