Information flow integrated optimization model of projects construction process

机译:项目建设过程信息流集成优化模型

获取原文
获取外文期刊封面目录资料

摘要

The main reasons for delay and overinvestment in construction projects are the unsmooth information flow. According to the project construction process, information flow of construction project is defined, and its model is constructed. Information flow model as the core content of information, combine the information resources, regulate the engineering project management process. Through the integrated optimization model of project construction process, using information management technology and computer and network technology, the interaction of information flow and material flow during the project are analyzed by project process model construction. Wireless system of construction site is constructed using wireless network and equipment. It allows staff and equipment to share information at real time, thus to optimize information flow of construction project. Accelerating flows of information, reduce the cost, improve the owner ability to the decision and control, and the level of management of construction projects.
机译:建设项目延迟和过度投资的主要原因是信息流不畅通。根据项目建设过程,定义了建设项目的信息流,并建立了模型。信息流模型作为信息的核心内容,结合信息资源,规范工程项目管理过程。通过项目建设过程的集成优化模型,利用信息管理技术以及计算机和网络技术,通过项目过程模型的建设来分析项目过程中信息流与物质流的相互作用。施工现场的无线系统是使用无线网络和设备构建的。它允许员工和设备实时共享信息,从而优化建设项目的信息流。加快信息流,降低成本,提高所有者的决策和控制能力以及建设项目的管理水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号