【24h】

Construction management pull for 4D CAD

机译:4D CAD的施工管理提示

获取原文
获取原文并翻译 | 示例

摘要

4D CAD work at present could be typified as "techno-construction-centric". This paper endeavours to provide a wider construction management perspective that will open up high value alternative areas for consideration. Construction is a dynamic, fragmented and combative industry. There is just not a stable platform for the adoption of sophisticated tools. In addition it is usual to speak of managing for time, cost and quality which is really quite misleading. The following performance dimensions are suggested: location (planning), function, aesthetics, cost, time, health and safety and environmental performance. This implies a broader, longer-term perspective beyond immediate project needs. Given the tacit-tacit emphasis of the industry, the mis-match with the explicit-explicit character of 4D CAD systems is stark. Instead of accuracy and detail, coarse robustness and connectedness are needed in systems that cover the important hard and soft dimensions The implication is that 4D CAD systems need to shift emphasis towards the tacit- explicit mode by accommodating the above wide range of hard and soft, long and short term performance dimensions (nD CAD). In parallel with this a push towards supporting explicit tacit knowledge conversion is needed with an emphasis on richer communications. The developments suggested will create a closer fit between the characteristics of the systems and the reality experienced by those in the industry. As such it will simply make more sense for such systems to be taken up through industry pull. Current 4D CAD Focus To date 4D CAD appears to be focused on integrating the technical design information respectively within the design and construction phases (eg Aalami and Fischer, 1998) This has great potential to unlock the synergies between the knowledge and experience of the designers and that of the constructors. These islands of know-how are typically isolated by education, tradition, orientation, contracts and processes. However, the thrust of the work seems to be limited to the technological issues, with a heavy emphasis on the construction phase. In short, 4D CAD work at present could be typified as "techno-construction-centtric". This paper endeavours to provide a wider construction management perspective that will open up high value alternative areas for consideration. In this way, it is hoped, the full benefits of the emerging technology can be developed. Unless otherwise stated a UK perspective is being taken.
机译:当前的4D CAD工作可以称为“以技术建造为中心”。本文致力于提供更广阔的施工管理视角,为高价值的替代领域提供参考。建筑是一个充满活力,支离破碎和好斗的产业。只是没有一个稳定的平台来采用复杂的工具。另外,通常讲的是管理时间,成本和质量,这确实很容易引起误解。建议以下性能指标:位置(计划),功能,美观,成本,时间,健康和安全以及环境绩效。这意味着除了眼前的项目需求之外,还有更广泛,更长期的观点。考虑到行业的默契与默契,与4D CAD系统的显性特征的不匹配非常明显。在覆盖重要的硬和软尺寸的系统中,需要粗略的鲁棒性和连通性,而不是准确性和细节。这意味着4D CAD系统需要通过适应上述各种硬和软范围,将重点转移到默认模式。长期和短期绩效指标(nD CAD)。与此同时,需要支持显式隐性知识转换,并着重于更丰富的通信。建议的开发将使系统的特性与行业人士所经历的现实之间更加紧密地契合。这样一来,通过行业拉动就可以采用这样的系统。当前4D CAD的重点迄今为止,4D CAD似乎专注于在设计和施工阶段分别集成技术设计信息(例如Aalami和Fischer,1998年)。这在释放设计师和设计师之间的知识和经验之间的协同作用方面具有巨大的潜力。构造函数。这些知识孤岛通常被教育,传统,方向,合同和过程所隔离。但是,这项工作的重点似乎仅限于技术问题,重点是施工阶段。简而言之,目前的4D CAD工作可以称为“以技术为中心的技术”。本文致力于提供更广阔的施工管理视角,为高价值的替代领域提供参考。希望以此方式可以开发出新兴技术的全部好处。除非另有说明,否则将采用英国的观点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号