【24h】

INTERFACE CONSIDERATIONS ON MULTIPLE PRIME CONTRACTOR CONSTRUCTION PROJECTS

机译:关于多个主要承包商建设项目的界面注意事项

获取原文
获取原文并翻译 | 示例

摘要

Most building construction programs involve a single prime construction contractor who subcontracts the specialty construction work. Sometimes for financial, schedule, or jobsite control reasons, an owner will choose not to use a single prime contractor and instead enter into multiple construction contracts directly with traditional trade subcontractors. Unless carefully pre-planned and executed, construction delivery using multiple prime contractors can result in project budget and schedule overruns because of questions of responsibilities for contractors and disagreements as to included scopes of work. This paper outlines by type of work, specific items that should be considered by an owner, construction manager, and/or designer when establishing the scopes for the various trade contracts on a multiple prime contractor project.
机译:大多数建筑施工计划都由一个主要的建筑承包商负责,该承包商将专业建筑工作分包。有时出于财务,进度或现场控制的原因,所有者会选择不使用单个主承包商,而是直接与传统贸易分包商签订多个建筑合同。除非经过仔细的预先计划和执行,否则使用多个主要承包商进行施工交付可能会导致项目预算和进度超支,原因是承包商的责任问题和对工作范围的分歧。本文按工作类型概述了在为多个主承包商项目建立各种贸易合同的范围时,所有者,施工经理和/或设计师应考虑的特定项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号