【24h】

GROUTING KARST TO SUPPORT DRIVEN PILE FOUNDATION FOR A TRUSS RAIL BRIDGE

机译:岩溶灌浆支持桁架桥的打桩基础

获取原文
获取原文并翻译 | 示例

摘要

The paper describes geotechnical investigations, design, construction, and performance evaluation of a grouting program completed to support a new railroad truss bridge over an Interstate highway in Pennsylvania. A large two-span truss was required to carry a local main for the Norfolk Southern Railroad across I-76 (Schuylkill Expressway) and new ramps. The construction project was required to improve access to I-76 from US Route 202 and US Route 422 in King of Prussia Pennsylvania. A geotechnical investigation indicated limestone rock below 15 to 20 m of medium clay. The clay was not suitable to support the high loadings imposed by the railroad bridge. The limestone was found to have frequent solution cavities on the order of 0.5 to 2 m in size, to depths of more than 30 m. The design solution was to grout the upper 3 m of the variable quality rock to form a mattress of stable rock to support driven piles over the deeper poor quality rock. The design used limited mobility displacement grouting. The paper presents technical details of the conditions encountered, design approach, construction observation and grouting data, and an analysis of the grouting records to indicate the performance of the grouting.
机译:本文介绍了一项注浆程序的岩土工程调查,设计,施工和性能评估,该程序已完成,以支持宾夕法尼亚州际公路上的新铁路桁架桥。需要一个大型的两跨桁架来承载穿过I-76(Schuylkill Expressway)和新坡道的诺福克南部铁路的本地干线。需要进行该建设项目,以改善宾夕法尼亚州普鲁士国王从202号公路和422号公路到I-76的交通。一项岩土工程研究表明,石灰岩的中粘土含量低于15至20 m。粘土不适合承受铁路桥梁施加的高载荷。发现该石灰石具有频繁的溶蚀腔,其大小为0.5至2 m,深度超过30 m。设计解决方案是将质量可变的岩石的上部3 m灌浆,以形成稳定的岩石垫层,以支撑深质量较差的岩石上的打入桩。该设计使用了有限的流动性位移灌浆。本文介绍了遇到的条件的技术细节,设计方法,施工观察和灌浆数据,以及对灌浆记录的分析以表明灌浆的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号