This paper outlines the first set up of the connection of precast deck slabs on steel girders for a new type of composite bridge in the developing stage. According to the published results about the perfo-bond connection in Beton- und Stahlbetonbau 12/1987 calculations and a test set-up are made for the perfo-bond connection of the in between slabs and tested according to chapter 10 of ENV 1994-1:1992 (EuroCode 4-1).
展开▼
机译:本文概述了在开发阶段,用于新型复合材料桥梁的钢梁上预制桥面板的首次连接。根据已发布的有关Beton- und Stahlbetonbau 12/1987中的全粘结连接的结果,计算并测试了板之间的全粘结连接,并根据ENV 1994-1的第10章进行了测试。 :1992(欧洲规范4-1)。
展开▼