首页> 外文会议>Complexity in Engineering (COMPENG), 2012 >Modeling of custom hydro turbine and governor models for real-time simulation
【24h】

Modeling of custom hydro turbine and governor models for real-time simulation

机译:定制水轮机和调速器模型的建模以进行实时仿真

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This article develops three different hydro turbine and governor (HTG) models to fulfill adequate modeling requirements for the representation of hydro power generation in the Nordic grid. To validate the performance of the developed models, both off-line and real-time simulation studies on a singlemachine infinite-bus (SMIB) system are carried out. Apart from SMIB system, real-time simulations are also executed for a larger scale power system — the IEEE Reliability Test System 1996 (IEEE RTS 96) in this article to determine the models' dynamic performance in larger and more complex networks. In addition, how to properly transfer an off-line models developed in SimPowerSystems (SPS) for real-time simulation in RT-LAB is addressed; including valuable experiences obtained from these simulation exercises.
机译:本文开发了三种不同的水轮机和调速器(HTG)模型,以满足在北欧电网中表示水力发电的适当建模要求。为了验证开发模型的性能,在单机无限总线(SMIB)系统上进行了离线和实时仿真研究。除SMIB系统外,还对大型电力系统(本文中的IEEE可靠性测试系统1996(IEEE RTS 96))执行实时仿真,以确定模型在更大和更复杂的网络中的动态性能。此外,还介绍了如何正确传输在SimPowerSystems(SPS)中开发的离线模型以在RT-LAB中进行实时仿真。包括从这些模拟练习中获得的宝贵经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号