首页> 外文会议>CMI conference Beijing >Study on Pipeline Installation Method in Mountain Tunnel in Seismic Area
【24h】

Study on Pipeline Installation Method in Mountain Tunnel in Seismic Area

机译:地震山岭隧道管道安装方法研究

获取原文
获取原文并翻译 | 示例

摘要

Generally speaking,there are three pipeline installation methods in mountain tunnel in seismic area: wall mounted,buried and bearing.There are no standards telling you which one is more appropriate.A general finite element software Ansys10.0 was used to simulate pipeline stress and strain under the earthquake load,and then adopting a modern numerical analysis method to analyze the results.At last,these three pipeline installation methods are compared in this paper in order to tell which one is the best,This should be a good reference to other projects.
机译:一般来说,地震地区山区隧道的管道安装方法有三种:壁挂式,埋入式和承压式。没有标准告诉您哪种方法更合适。使用通用有限元软件Ansys10.0来模拟管道应力和压力。然后采用现代数值分析方法对结果进行分析。最后,对这三种管道安装方法进行了比较,以找出哪种方法最好,这对其他方法应有很好的参考价值。项目。

著录项

  • 来源
    《CMI conference Beijing 》|2012年|1128-1133|共6页
  • 会议地点 Beijing(CN)
  • 作者单位

    Master, China Petroleum Pipeline Engineering Corporation;

    No.146, Heping Road, Langfang 065000;

    Master, China Petroleum Pipeline Engineering Corporation;

    No.146, Heping Road, Langfang 065000;

    Master, China Petroleum Pipeline Engineering Corporation;

    No.146, Heping Road, Langfang 065000;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 U692.22;
  • 关键词

    Mountain Tunnel; Pipeline Installation; Seismic Area;

    机译:山区隧道管道安装地震区;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号