首页> 外文会议>Challenges of Power Engineering and Environment >Coal-Fired Boiler Plant History for Malaysian Projects
【24h】

Coal-Fired Boiler Plant History for Malaysian Projects

机译:马来西亚项目的燃煤锅炉厂历史

获取原文

摘要

Electricity demand in Southeast Asia, in particular Malaysia has been growing very steadily over the past two decades. IHI corporation (IHI) has been a key player in the supply of thermal power boilers to meet the power demands in the country. To cap our strong presence and experience, large scale coal-fired power boilers have been newly designed and constructed at Tanjung Bin Power Plant (3 units of 700MW boilers), which is the largest coal-fired Independent Power Plant in Southeast Asia. The boilers have been designed as coal firing units in order to meet the government policy in balancing energy resources through avoiding over-dependence on any particular energy resource. Coal resources are widely distributed throughout the world, especially in countries surrounding Malaysia which include Indonesia, Australia, China and South Africa.Tanjung Bin Power Plant is designed to burn either entirely bituminous coals or blended with up to 30% sub-bituminous coals. The 1st and 2nd units of Tanjung Bin Power Plant have successfully gone into commercial operation. With the 1st Unit completed 16 days ahead of the contractual schedule.This paper covers a brief history of thermal power plants in Malaysia and the technical features of Tanjung Bin Power Plant.
机译:过去二十年来,东南亚,特别是马来西亚的电力需求一直非常稳定地增长。为了满足该国的电力需求,IHI公司(IHI)一直是火力锅炉供应的主要参与者。为了充实我们的强大实力和经验,已在东南亚最大的燃煤独立电厂丹绒宾电厂(3台700MW锅炉)上新建并建造了大型燃煤锅炉。锅炉被设计为燃煤机组,以通过避免过度依赖任何特定能源来满足政府平衡能源的政策。煤炭资源广泛分布在世界各地,尤其是在马来西亚周边的国家中,包括印度尼西亚,澳大利亚,中国和南非。丹绒宾发电厂的设计目的是燃烧完全烟煤或与高达30%的次烟煤混合。丹绒宾发电厂的第一和第二单元已成功投入商业运行。一号机组比合同时间表提前了16天完成。本文介绍了马来西亚火力发电厂的简要历史以及丹戎宾发电厂的技术特点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号