The Head of Hylebos Waterway is part of the Commencement Bay Superfund Site in Tacoma, Washington. Dredging at the site is scheduled to begin on July 16, 2004 to remove over 230,000 cubic meters (300,000 cubic yards) of impacted sediment, with disposal at a regional upland landfill. This project incorporates many of the latest advances in remedial design, dredging, and monitoring to limit residual contamination following cleanup and to lower overall project costs. The paper presents specific discussion on each of the following project components: 1. Digital dredge controls 2. Two-pass dredging plan 3. Water management 4. Continuous monitoring of water quality 5. Rail transport and landfill disposal of dredged material The paper describes how these various project components have been developed and their purpose in reducing residual contamination, increasing the potential for project success without repetitive dredge passes, and lowering total project costs.
机译:Hylebos Waterway的负责人是华盛顿塔科马市Commencement Bay Superfund网站的一部分。计划于2004年7月16日开始在该地点进行疏ed,以清除230,000立方米(300,000立方码)的受影响沉积物,并在区域性的高地垃圾填埋场处置。该项目结合了补救设计,疏dr和监控方面的许多最新进展,以限制清理后的残留污染并降低总体项目成本。本文对以下项目的每个组成部分进行了具体讨论:1.数字疏edge控制2.两次疏dr计划3.水管理4.连续监测水质5.疏Rail材料的铁路运输和垃圾掩埋处理本文描述了如何已经开发了这些项目的各个组成部分,其目的是减少残留污染,增加项目成功的可能性而无需重复进行挖泥机以及降低项目总成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号