首页> 外文会议>Business Process Management Workshops >Mobile Workforce Scheduling Problem with Multitask-Processes
【24h】

Mobile Workforce Scheduling Problem with Multitask-Processes

机译:多任务流程的移动劳动力调度问题

获取原文
获取原文并翻译 | 示例

摘要

In this work we introduce a new generalization of the Resource-Constrained Project Scheduling Problem - the Mobile Workforce Scheduling Problem with Multitask-Processes (MWSP-MP). This scheduling problem arises in mobile work scenarios and is characterized by tasks to be scheduled that are not independent from each other, but belong to structured business processes. These business processes are subject to timing and cost related properties and restrictions that have to be considered for the scheduling of resources. We fortify the relevance of the MWSP-MP by illustration with process examples from the utility industry and present an initial heuristic for the insertion of processes into solutions of the problem.
机译:在这项工作中,我们介绍了资源受限的项目计划问题的新概括-具有多任务过程的移动劳动力计划问题(MWSP-MP)。这种调度问题出现在移动工作场景中,其特点是要调度的任务彼此独立,但属于结构化业务流程。这些业务流程受制于与时间和成本相关的属性和限制,而资源调度必须考虑这些限制。我们通过使用公用事业行业中的过程示例进行说明来增强MWSP-MP的相关性,并提出了将过程插入问题解决方案的初步方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号