首页> 外文会议>Business Engineering and Industrial Applications Colloquium (BEIAC), 2012 IEEE >A Balanced Scorecard approach in evaluating IT projects in the public sector
【24h】

A Balanced Scorecard approach in evaluating IT projects in the public sector

机译:评估公共部门IT项目的平衡计分卡方法

获取原文
获取原文并翻译 | 示例

摘要

Malaysian public sector is highly encouraged to utilize IT to improve their public services delivery to the public. Therefore, numerous IT projects have been approved and funded under several Malaysian National Plans. As the success of the existing or current IT projects in public sector are not properly evaluated has resulted in the same failures due to non-existence of a specific guideline, method or tool that can be used by public sector to evaluate their IT projects. This research aims at investigating the practice of IT project evaluation among the public sector agencies and analyzes how Malaysian public agencies evaluate their IT projects success or failure. A case study was conducted at one of the ministry as to seek data and information pertaining to the current practice of Malaysian government agencies in handling IT project evaluations. As anticipated, many project managers in public sector did not conduct IT projects evaluations. If it were conducted, most of the evaluations conducted improperly. The reasons why IT projects evaluation were not conducted properly were mainly because of the project managers did not have formal training and experience on IT projects evaluation and have not enough personnel to conduct IT projects evaluation. An IT project evaluation guideline has been developed, based on Balanced Scorecard and weighted scoring model, as a reference and guidance on conducting IT project evaluation.
机译:强烈鼓励马来西亚公共部门利用IT来改善其向公众提供的公共服务。因此,许多马来西亚国家计划已批准并资助了许多IT项目。由于未正确评估公共部门中现有或当前IT项目的成功,由于没有公共部门可用来评估其IT项目的特定准则,方法或工具,导致了同样的失败。这项研究旨在调查公共部门机构中IT项目评估的实践,并分析马来西亚公共机构如何评估其IT项目的成败。在一个部门中进行了一个案例研究,以寻求与马来西亚政府机构在处理IT项目评估方面的当前实践有关的数据和信息。正如预期的那样,许多公共部门的项目经理没有进行IT项目评估。如果进行了评估,则大多数评估均进行不当。 IT项目评估未正确进行的原因主要是因为项目经理没有接受有关IT项目评估的正式培训和经验,并且没有足够的人员来进行IT项目评估。根据平衡计分卡和加权评分模型,制定了IT项目评估指南,作为进行IT项目评估的参考和指南。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号