首页> 外文会议>The International Bridge Conference 2018 >Working Out of a Corner – The Route 5 Bridge Replacement Project
【24h】

Working Out of a Corner – The Route 5 Bridge Replacement Project

机译:尽力而为– 5号公路桥梁更换项目

获取原文
获取原文并翻译 | 示例

摘要

The engineering, communication, and coordination strategies used duringthe development and construction of the Historical Route 5 Bridge in Richmond, Virginiacan be employed by leadership teams to successfully complete even the most complicatedprojects. The historical nature, strict timeframes, and restrictive project site generatedstrategic design and replacement techniques. Working around, over, and under railroads,utilities and adjacent projects, the team was able to work out of a corner and meet theunique challenges.
机译:在弗吉尼亚州里士满历史5号公路桥梁的开发和建设过程中使用的工程,沟通和协调策略可以被领导团队用来成功完成甚至最复杂的项目。历史的性质,严格的时间表和限制性的项目站点产生了战略设计和替换技术。在铁路,公用事业和相邻项目的周围,上方和下方工作,该团队能够在一个角落工作并应对独特的挑战。

著录项

  • 来源
  • 会议地点
  • 作者

    ERIC THORNTON; SCOTT FISHER;

  • 作者单位

    Virginia Department of Transportation, Richmond, Virginia;

    Virginia Department of Transportation, Richmond, Virginia;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-26 14:32:18

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号