Grouting experiment on forming artificial Pillar for Pillar stoping

机译:人工立柱止桩注浆试验。

获取原文
获取原文并翻译 | 示例

摘要

In the process of pillar stoping, how to reduce ore’s dilution is always the prime concern of mining engineer. According to the key technique of grouting theory, the grouting tests to form the artificial pillar were done by using homemade test device, and grouting effects of different grouting methods were contrasted. The result indicates that the capability of crushed stones after grouting was improved remarkably. After analyzing the test data, the correlation of grouting parameters was analyzed, such as grouting permeating distance, injection volume, and so on. It was shown that the distinct influencing factor on injected volume was water cement ratio,but the influences of height of injected hole and porosity were small; compared with water cement ratio and height of injected hole, injection volume was the important factor on grouting permeating. The test result has some project referential value.
机译:在立柱停止的过程中,如何减少矿石的稀释度一直是采矿工程师最关心的问题。根据注浆理论的关键技术,采用自制的试验装置对人造桩进行注浆试验,对比了不同注浆方法的注浆效果。结果表明,灌浆后碎石的能力明显提高。分析测试数据后,分析了注浆参数的相关性,如注浆渗透距离,注水量等。结果表明,影响注水量的主要因素是水胶比,但注孔高度和孔隙度的影响较小。与注水泥比和注水孔高度相比,注水量是影响灌浆渗透的重要因素。测试结果具有一定的项目参考价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号