【24h】

Post Evaluation of Water Pollution Control Planning for Huai River Basin in China

机译:中国淮河流域水污染控制计划的后期评估

获取原文
获取原文并翻译 | 示例

摘要

Post evaluation methodology for river basin water pollution control planning has been applied to Huai River Basin plan (2001-2005). It consists of assessment on plan enforcement results and enforcement process. The former is conducted through the multi-criteria comprehensive evaluation method based on an indicator system. And the latter is to assess the impact of natural endowment, plan preparation assumptions, policy factors, institutional factor, and management factor on the plan implementation. The evaluation showed that the Huai River Basin plan has not been well implemented. Based on detailed analysis, the underestimation of economic development and the limited effect of industrial structure adjustment policy have been found as two of the reasons for plan implementation failure.
机译:流域水污染控制规划的后评价方法已应用于淮河流域规划(2001-2005年)。它包括对计划执行结果和执行过程的评估。前者是通过基于指标体系的多标准综合评估方法进行的。后者是评估自然end赋,计划编制假设,政策因素,制度因素和管理因素对计划实施的影响。评估表明,淮河流域计划没有得到很好的执行。在详细分析的基础上,发现经济发展的低估和产业结构调整政策的有限效果是计划执行失败的两个原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号