CHINA'S MODERN DAY GREAT WALL - THE 40' WEST TO EAST GAS PIPELINE PROJECT

机译:中国的现代长城-天然气管道西段40年代

获取原文
获取原文并翻译 | 示例

摘要

PetroChina's West to East Natural Gas Pipeline Project (WEPP) has been under construction since October of 2001. Upon completion, construction will be completed on the following major facilities: 3,800 km of 1,016 mm mainline; 294 km of 813 mm, 508 mm, and 406 mm lateral lines; Dual fiber optic conduits with the mainline pipeline; 1,100 km of access roads; 23 metering stations; 18 pigging stations; 10 compressor stations; 16 mountain tunnels; 16 aerial crossings; 41 mainline and 18 lateral line HDDs; 1 crossing of the Yangtze River (a 4.4 m concrete lined tunnel); 3 crossings of the Yellow River (pipe jacking, tunnel and aerial methods); gas control center and SCADA system. This paper covers topics including construction management; engineering, procurement, and construction; major construction challenges; and, business in China.
机译:中国石油西气东输管道工程(WEPP)自2001年10月开始建设。完工后,以下主要设施将完工:3,800公里长的1,016毫米主干线; 294公里的813毫米,508毫米和406毫米横线;带有干线管道的双光纤导管; 1100公里的通行道路; 23个计量站; 18个清管站; 10个压缩机站; 16条山地隧道; 16个空中过境点; 41个主线和18个侧线硬盘驱动器; 1条穿越长江(4.4 m混凝土衬砌隧道);黄河的3个过境点(顶管,隧道和空中方法);气体控制中心和SCADA系统。本文涵盖的主题包括施工管理;工程,采购和施工;重大建筑挑战;并且,在中国开展业务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号