The design and construction of the basement wall for the Scottish Parliament Building, Edinburgh

机译:爱丁堡苏格兰议会大厦地下室墙的设计和施工

获取原文
获取原文并翻译 | 示例

摘要

The basement walls for the new Scottish Parliament building are an interesting example of a design developing and evolving throughout the construction process. 1. Concerns about the capability of the proposed drilling rigs to form the necessary sockets below "Engineering Rockhead" led to the development of the shear pins as a contingency measure. Ultimately, these proved unnecessary. 2. In order to speed up construction, a steel waling system was adopted. In practice, the difficulty of forming the dowel connection to the concrete piles eliminated any time savings that might have accrued. When the eastern section of the site was added to the construction package, the steel waling system was discontinued. 3. Increased confidence in the drilling rigs capability led to the adoption of increased rock sockets and only one row of anchors for the eastern extension to the contract.
机译:苏格兰新议会大楼的地下室墙是整个设计过程中设计开发和发展的有趣示例。 1.由于担心拟议的钻机在“工程岩头”下方形成必要的承窝的能力,导致开发了作为应急措施的剪切销。最终,这些被证明是不必要的。 2.为了加快施工速度,采用了钢制排水系统。实际上,与混凝土桩形成销钉连接的困难消除了可能节省的任何时间。当站点的东部部分添加到建筑包中时,钢制吊索系统就停止了。 3.人们对钻机能力的信心增强,导致采用了更多的石槽,并且只为合同的东部延伸部分增加了一排锚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号