THE REFURBISHMENT AND FUTURE CORROSION PREVENTION OF LARGE CONCRETE GUTTERS USING IMPRESSED CURRENT CATHODIC PROTECTION

机译:利用现成的阴极保护对大型混凝土内胆进行翻新和防止未来腐蚀

获取原文
获取原文并翻译 | 示例

摘要

Concrete gutters installed in a public school have suffered extensive deterioration, to the point that delamination/spalling of the white quartz facing and cracking on the inside surface of the concrete gutters are common phenomena, posing a distinct safety hazard to both staff and pupils. Rectification was considered urgent and given a high priority by the Department of Housing and Works. Remediation required that the gutters be either replaced or repaired in situ. Due to the method of original construction and the need to maintain full availability of the school facilities, replacement could only have been carried out during school holiday periods, which would have resulted in a piecemeal construction phase over at least two years. Damage to the roof structure and ceilings during this work would have necessitated additional repairs, resulting in extra expense and temporary loss of facilities. The alternative was to cut out damaged concrete and repair or replace the reinforcement locally, and then install an impressed current cathodic protection system to the affected gutters to prevent progressive damage in the future. This Paper describes some of the problems encountered during construction, and in particular shows the extent of insipient damage discovered during the repair period. The design of the cathodic protection to suit the repairs is detailed, and the eventual outcome demonstrated.
机译:公立学校中安装的混凝土排水沟已经严重恶化,以至于白色石英表面的分层/剥落和混凝土排水沟的内表面开裂是普遍现象,对教职员工和学生构成了明显的安全隐患。住房和工程部认为整改很紧急,并给予了高度重视。补救措施要求对排水沟进行原位更换或修复。由于采用了原始建造方法,并且需要保持学校设施的全部可用性,因此只能在学校放假期间进行更换,这将导致至少两年的零星建设阶段。在此过程中,如果损坏屋顶结构和天花板,则必须进行额外的维修,从而导致额外费用和设备的暂时损失。替代方法是切掉损坏的混凝土,并在当地维修或更换钢筋,然后在受影响的排水沟上安装先进的现有阴极保护系统,以防止将来逐渐损坏。本文介绍了在施工过程中遇到的一些问题,尤其是说明了在维修期间发现的潜在损坏程度。详细介绍了适合维修的阴极保护设计,并证明了最终结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号