首页> 外文会议>ASME/ASCE/IEEE joint rail conference 2011 >Analytical possibilities of doing capacity research in rail station areas
【24h】

Analytical possibilities of doing capacity research in rail station areas

机译:在火车站区域进行容量研究的分析可能性

获取原文
获取原文并翻译 | 示例

摘要

Railway specialists expect that the demand for rail-bound passenger and freight traffic in the US will increase enormously in the coming years. Implementing the American Recovery and Reinvestment Act (ARRA) of 2009, new high-speed lines will be created throughout the nation. This will lead to an additional increase of passenger traffic demand. Experiences from Western Europe have shown that new high-speed passenger lines will cause changes in user demand behavior as well as an augmentation of the importance of regional lines featuring connections to the high-speed network. The existing stations will not only be greater utilized by the new high-speed lines, but a growth in demand for regional lines could also require an increasing number of trains. That could lead to greater infrastructure utilization as well. Both aspects lead to the question of whether the already existing large stations of the future high-speed network possess enough capacity for handling such a large number of trains. It is comprehensible that station capacity will play a very important role for planning new corridors. While UIC Code 406 contains first steps of defining a standardized method for doing line capacity research, it does not include any information about station capacity evaluations. A few analytical methods for doing such evaluations are described in this paper. Most of these methods are easy to apply but offer important values for evaluating existing station infrastructure as well as timetables. It is also shown that the compression method presented in UIC Code 406 cannot be used for doing station capacity research.
机译:铁路专家预计,未来几年美国对铁路客运和货运的需求将大大增加。实施2009年的《美国复苏与再投资法案》(ARRA),将在全国范围内创建新的高速铁路。这将导致旅客交通需求的额外增加。来自西欧的经验表明,新的高速客运专线将引起用户需求行为的变化,并增加具有高速网络连接能力的区域专线的重要性。新的高速铁路不仅将更多地利用现有的车站,而且地区铁路需求的增长也可能需要增加火车数量。这也可能导致更高的基础设施利用率。这两个方面都带来了一个问题,即未来高速网络中已经存在的大型站是否具有足够的容量来处理如此大量的列车。可以理解的是,车站的容量将在规划新走廊方面发挥非常重要的作用。尽管UIC代码406包含定义用于进行线路容量研究的标准化方法的第一步,但它不包括有关站点容量评估的任何信息。本文介绍了进行此类评估的几种分析方法。这些方法大多数都易于应用,但是为评估现有的站点基础结构和时间表提供了重要的价值。还表明,UIC代码406中介绍的压缩方法不能用于进行站点容量研究。

著录项

  • 来源
  • 会议地点 Pueblo CO(US);Pueblo CO(US)
  • 作者

    Tobias Lindner;

  • 作者单位

    TU Braunschweig Institute of Railway Systems Engineering and Traffic Safety Braunschweig, Germany;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 铁路运输;
  • 关键词

  • 入库时间 2022-08-26 14:08:39

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号