首页> 外文会议>ASME Power Conference 2005: Includes Papers from the 2005 International Conference on Power Engineering(ICOPE) pt.A >A SEQUENTIAL APPROACH FOR GAS TURBINE POWER PLANT PREVENTIVE MAINTENANCE SCHEDULING
【24h】

A SEQUENTIAL APPROACH FOR GAS TURBINE POWER PLANT PREVENTIVE MAINTENANCE SCHEDULING

机译:燃气轮机电厂预防性维护调度的序贯方法

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Traditionally the gas turbine power plant preventive maintenances are scheduled with constant maintenance intervals based on recommendations from the equipment suppliers. The preventive maintenances are based on fleet wide experiences, and they are scheduled in a one-size-fit-all fashion. However, in reality, the operating conditions for each gas turbine may vary from site to site, and from unit to unit. Furthermore, the gas turbine is a repairable deteriorating system, and preventive maintenance usually restores only part of its performance. This suggests the gas turbines need more frequent inspection and maintenance as it ages. A unit specific sequential preventive maintenance approach is therefore needed for gas turbine power plants preventive maintenance scheduling. Traditionally the optimization criteria for preventive maintenance scheduling is usually cost based. In the deregulated electric power market, a profit based optimization approach is expected to be more effective than the cost based approach. In such an approach, power plant performance, reliability, and the market dynamics are considered in a joint fashion. In this paper, a novel idea that economics drive maintenance expense and frequency to more frequent repairs and greater expense as the equipment and components age is introduced, and a profit based unit specific sequential preventive maintenance scheduling methodology is developed. To demonstrate the feasibility of the proposed approach, this methodology is implemented using a base load combined cycle power plant with single gas turbine unit.
机译:传统上,燃气轮机电厂的预防性维护是根据设备供应商的建议按固定的维护间隔安排的。预防性维护基于舰队的广泛经验,并且以一种适合所有人的方式进行计划。但是,实际上,每个燃气轮机的运行条件可能因站点而异,并且因设备而异。此外,燃气轮机是可修复的恶化系统,预防性维护通常只能恢复其部分性能。这表明燃气轮机随着年龄的增长需要更频繁的检查和维护。因此,对于燃气轮机电厂的预防性维护计划,需要一种特定于设备的顺序预防性维护方法。传统上,预防性维护计划的优化标准通常基于成本。在放松管制的电力市场中,基于利润的优化方法有望比基于成本的方法更为有效。在这种方法中,电厂性能,可靠性和市场动态是共同考虑的。在本文中,提出了一种新颖的想法,即随着设备和组件的老化,经济因素会导致维护费用和频率增加,从而导致更频繁的维修和更大的费用,并且开发了基于利润的特定于单元的顺序预防性维护计划方法。为了证明所提出方法的可行性,该方法是使用带有单个燃气轮机单元的基本负荷联合循环发电厂实施的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号