首页> 外文会议>ASME international pipeline conference 2008 >Best Practices in Damage Prevention for Parallel Construction Projects
【24h】

Best Practices in Damage Prevention for Parallel Construction Projects

机译:并行建设项目预防损坏的最佳实践

获取原文
获取原文并翻译 | 示例

摘要

New pipelines are increasingly being encouraged (or forced...) to share common or adjacent rights of way with existing utilities. Installation parallel to existing underground facilities for long distances greatly complicates construction and damage prevention, and creates a multitude of opportunities for damage to occur. This paper describes current regulatory and industry association efforts to address these issues, and gives a case study of a real accident that was caused during parallel construction of a water main adjacent to an HVL pipeline.
机译:越来越多的新管道被鼓励(或被迫...)与现有公用事业共享共同或相邻的通行权。与现有地下设施的长距离平行安装大大增加了施工和预防损坏的难度,并为损坏创造了很多机会。本文介绍了当前的监管机构和行业协会为解决这些问题而做出的努力,并提供了一个案例研究,该案例是在平行建造一条与HVL管道相邻的供水总管期间引起的实际事故。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号