【24h】

RISK BASED INSPECTION (RBI) OF STEAM SYSTEMS

机译:蒸汽系统的基于风险的检查(RBI)

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the implementation of a risk-based inspection program for process and utility steam lines in a large chemical process facility. The paper addresses the development of an RBI matrix, the likelihood attributes, the consequence scores, and the overall risk in terms of personnel safety and costs. The likelihood of failure considers prior experience, degradation mechanisms, novelty of process, abnormal loads and age. The consequence of failure considers public health and safety, worker health and safety, environmental impact, operations impact, and recovery costs. Once assigned a likelihood and consequence score, systems are plotted on the RBI matrix to develop inspection priorities. The RBI ranking determines which systems will be inspected (high risk) and those that need not be inspected (low risk). The risk ranking is followed by inspection planning which includes selection of the inspection technique and inspection locations, together with the development of pre-inspection acceptance criteria.
机译:本文介绍了在大型化学过程设施中针对过程和公用蒸汽管线的基于风险的检查程序的实施。本文讨论了RBI矩阵的开发,可能性属性,结果评分以及人员安全和成本方面的总体风险。失败的可能性考虑了先前的经验,退化机制,过程的新颖性,异常负载和寿命。失败的后果考虑了公共健康和安全,工人健康和安全,环境影响,运营影响以及恢复成本。一旦分配了可能性和后果评分,就可以在RBI矩阵上绘制系统以制定检查优先级。 RBI等级确定将检查哪些系统(高风险)和不需要检查的系统(低风险)。风险等级之后是检查计划,其中包括选择检查技术和检查位置以及制定检查前验收标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号