首页> 外文会议>Asia-Pacific Web Conference; 20050329-0401; Shanghai(CN) >Temporal Dependency for Dynamic Verification of Fixed-Date Constraints in Grid Workflow Systems
【24h】

Temporal Dependency for Dynamic Verification of Fixed-Date Constraints in Grid Workflow Systems

机译:网格工作流系统中固定日期约束的动态验证的时间依赖性

获取原文
获取原文并翻译 | 示例

摘要

Grid workflow systems aim to support large-scale complex e-science and e-business processes. Due to the complexity of these kinds of processes, to control the execution of them in terms of time in the grid workflow execution environments, multiple fixed-date temporal constraints often need to be set simultaneously. Hence the dependency problem between them must be considered and emphasised, which affects the verification effectiveness and efficiency of the fixed-date temporal constraints. However, current relevant workflow verification works do not take into consideration this dependency. Therefore, in this paper, we explore it in depth and analyse its impact on the verification of the fixed-date temporal constraints. Furthermore, based on the temporal dependency, we develop some new temporal verification methods and algorithms. The comparison and evaluation show that these new methods and algorithms make the verification more effective and efficient. All these analyses, new methods and algorithms further strengthen the grid workflow time management.
机译:网格工作流系统旨在支持大规模的复杂电子科学和电子商务流程。由于这类过程的复杂性,为了在网格工作流执行环境中根据时间控制它们的执行,常常需要同时设置多个固定日期时间约束。因此,必须考虑和强调它们之间的依赖关系问题,这会影响固定日期时间约束的验证有效性和效率。但是,当前相关的工作流程验证工作并未考虑这种依赖性。因此,在本文中,我们将对其进行深入研究,并分析其对固定日期时间约束的验证的影响。此外,基于时间依赖性,我们开发了一些新的时间验证方法和算法。比较和评估表明,这些新方法和算法使验证更加有效。所有这些分析,新方法和算法进一步加强了网格工作流时间管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号