首页> 外文会议>Asia-Pacific Power and Energy Engineering Conference;APPEEC >Drainage System Optimization of Powerhouse Foundation Pit in Construction Period for Jinnah Hydropower Project
【24h】

Drainage System Optimization of Powerhouse Foundation Pit in Construction Period for Jinnah Hydropower Project

机译:晋纳水电站工程厂房厂房基坑排水系统优化。

获取原文

摘要

The powerhouse of Jinnah Hydropower Station on Indus River in Pakistan is sitting on a deep overburden layer with maximum depth of 200m. A three- dimensional (3-D) finite element model of seepage flow is set up, which can represent the project geological structure and the geometry boundary of the powerhouse foundation. The influence of different layout schemes to seepage filed of foundation is analyzed and compared in detail, such as setting up the high pressure jet grouting cut-off wall (HPJGCW) and its depth, different number and space between drainage wells etc. An optimizing drainage system of powerhouse foundation pit during the construction stage is put forward. The optimizing drainage system is Scheme 3, which is drainage ditches on ground surface with outer round of HPJGCW and drainage ditches of foundation pit.
机译:巴基斯坦印度河上的真纳水电站的发电站坐落在深层覆盖层上,最大深度为200m。建立了渗流三维三维有限元模型,该模型可以表示工程地质结构和厂房基础的几何边界。分析并比较了不同布置方案对基础渗流的影响,如设置高压喷射注浆防渗墙(HPJGCW)及其深度,排水井之间的数量和间距等。优化排水提出了施工期厂房基坑开挖系统。最优化的排水系统是方案3,该方案是HPJGCW外圆的地表排水沟和基坑的排水沟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号