PRESSURE RESPONSE TO PRODUCTION AND INJECTION AT THE MIRAVALLES GEOTHERMAL FIELD

机译:在米伐尔地热场中对生产和注入的压力响应

获取原文
获取原文并翻译 | 示例

摘要

The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe, installed 1994), a wellhead unit (5 MWe, 1995), Unit 2 (55 MWe, 1998) and Unit 3 (27.5 MWe, 2000). Unit 5, a 15.5 MWe "bottoming cycle" unit, is expected to complete its final tests by February 2004, at which point the total installed capacity in Miravalles will be 158 MWe. The behavior of reservoir pressure during the period of exploitation is described in the following sections. Over the first ten years of exploitation, the field has successfully supplied the steam needed to generate at the installed capacity.
机译:自1994年3月以来,Miravalles地热田一直在生产电能。它为1号机组(55 MWe,1994年安装),井口机组(5 MWe,1995年),2号机组(55 MWe,1998年)和3号机组( 27.5 MWe,2000)。 5号机组是一个15.5 MWe的“底部循环”装置,预计将于2004年2月完成最终测试,届时Miravalles的总装机容量将为158 MWe。以下各节描述了开采期间储层压力的行为。在开采的最初十年中,该油田已成功地提供了以装机容量产生所需的蒸汽。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号