INJECTION MANAGEMENT AT THE MIRAVALLES GEOTHERMAL FIELD

机译:偏微地热场的注射管理

获取原文
获取原文并翻译 | 示例

摘要

Electricity began to be produced at the Miravalles geothermal field in early 1994. Since then, the installed capacity has increased from 55 MWe to 142.5 MWe. A binary plant (15.5 MWe) will be finishing its final tests by February 2004, increasing the field's capacity to 158 MWe. The management of injection in the field during nearly ten years of exploitation is described in the following sections. The most recent numerical simulation of the Miravalles reservoir suggested changing the distribution of injection (more to the west and less to the south), in order to improve the performance of the reservoir. These changes were implemented, and their results are presented.
机译:1994年初,在Miravalles地热田开始发电。从那时起,装机容量从55 MWe增加到142.5 MWe。二氧化工厂(15.5 MWe)将在2004年2月之前完成其最终测试,届时该油田的产能将增至158 MWe。以下各节介绍了在开采近十年中在野外进行的注射管理。 Miravalles油藏的最新数值模拟建议改变注入的分布(向西增加,向南减少),以改善油藏的性能。实施了这些更改,并介绍了其结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号