首页> 外文会议>Annual Water Environment Federation technical exhibition and conference >Hacking Project Delivery at Silicon Valley Clean Water using Progressive Design-Build
【24h】

Hacking Project Delivery at Silicon Valley Clean Water using Progressive Design-Build

机译:使用渐进式设计-构建在硅谷净水区进行项目交付

获取原文

摘要

Silicon Valley Clean Water (SVCW), a wastewater treatment agency in California, is using the progressive design-build (PDB) process to deliver three large CIP projects: 1) a large diameter raw wastewater conveyance tunnel/pipeline (approximately $220 MM USD), 2) a new influent lift station and headworks facilities ($120MM USD), and 3) improvements to three conveyance pump stations ($65MM USD). In this paper, we describe our reasons for selecting PDB delivery for these projects, and share experiences in working through the procurement process including RFP details, contract terms and the negotiation process and initial design stage.
机译:加利福尼亚州的废水处理机构硅谷清洁水(SVCW)正在使用渐进式设计-建造(PDB)流程交付三个大型CIP项目:1)大口径的原废水输送隧道/管道(约220百万美元) ,2)新建的进水升降站和水上作业设施(120MM美元),以及3)改进了三个输送泵站(65MM美元)。在本文中,我们描述了为这些项目选择PDB交付的原因,并分享了在整个采购过程中的经验,包括RFP详细信息,合同条款以及谈判过程和初始设计阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号