首页> 外文会议>Annual North American Waste to Energy Conference(NAWTEC15); 20070521-23; Miami,FL(US) >Grate and Boiler Technology Assessment for a New WTE Plant in the U.S
【24h】

Grate and Boiler Technology Assessment for a New WTE Plant in the U.S

机译:美国新建WTE工厂的炉排和锅炉技术评估

获取原文
获取原文并翻译 | 示例

摘要

The Olmsted County Waste-to-Energy Facility (WTE) is in the process of expanding the facility capacity. The original facility began commercial operation in 1987 and consists of two 100 tpd units, equipped with Riley boilers and Takuma grates. The plant was built during the construction boom for WTE plants in the U.S. At that time there were some industry leading technologies, and also were many other players in the field offering European, Japanese, as well as U.S. technologies for the combustion of MSW. The industry has changed since those exciting times when nearly every city and urban county in the country would at least consider WTE. Years of industry stagnation caused by a number of events and trends resulted in the merger, bankruptcy, or pull out of WTE engineering firms in the U.S. market. Today there are only a handful of technologies used and an even smaller fraternity of private operating companies. Many private and publicly operated WTE facilities continue to operate successfully and recently several are in various stages of facility expansion or new plant development. Olmsted County started this process three years ago laying the groundwork for a facility expansion to double its capacity. Currently, the County is in the engineering phase of the expansion and expects to begin construction in 2007. The engineering effort includes consideration of commercially available combustion technologies and procurement of this equipment. This paper looks briefly at the historical availability of grate and boiler technologies and the findings of the County's assessment of technologies available in the U.S. market.
机译:奥尔姆斯特德县垃圾发电设施(WTE)正在扩大设施的能力。最初的设施于1987年开始商业运行,由两个100吨/天的装置组成,配备了莱利锅炉和Takuma炉排。该工厂是在美国WTE工厂的建设热潮期间建造的。当时有一些行业领先的技术,并且该领域的许多其他参与者还提供了欧洲,日本以及用于MSW燃烧的美国技术。从那个激动人心的时代开始,行业发生了变化,当时该国几乎每个城市和县都会至少考虑使用WTE。一系列事件和趋势导致多年的行业停滞导致合并,破产或退出美国市场的WTE工程公司。如今,仅使用了很少的技术,而私营运营公司的兄弟会也更少。许多私人和公共运营的WTE设施继续成功运行,最近有几个处于设施扩展或新工厂开发的不同阶段。奥尔姆斯特德县(Olmsted County)在三年前就开始了这一过程,为扩建设施使其产能翻番奠定了基础。目前,该县正处于扩建的工程阶段,预计将于2007年开始建设。工程工作包括考虑商用燃烧技术和购买该设备。本文简要介绍了炉排和锅炉技术的历史可用性以及该县对美国市场上可用技术的评估结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号