首页> 外文会议>Annual conference and exhibition of the American Wind Energy Association >French Wind POwer Generation Programme EOLE 2005 - First Results
【24h】

French Wind POwer Generation Programme EOLE 2005 - First Results

机译:法国风能发电计划EOLE 2005-初步结果

获取原文
获取原文并翻译 | 示例

摘要

EOLE 2005 has been launched in July 1996 by the French Ministry of Industry, Electricite de France and ADEME (Agency for Environment and Energy Management). The Ministries of Research and Environment are participating also in this programme. The purpose is to create an initial market in france for wind power generation in order to evalaute the cost-effectivenss and the competitiveness of the wind energy compared to other energy sources by 2005. The installed capacity will reach at least 250 MW and possibly 500 MW.
机译:EOLE 2005由法国工业部,法国电力公司和ADEME(环境与能源管理机构)于1996年7月启动。研究和环境部也参加了该计划。目的是在法国建立风力发电的初始市场,以便在2005年之前实现风能的成本效益和与其他能源相比的竞争力。装机容量将至少达到250兆瓦,甚至可能达到500兆瓦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号