首页> 外文会议>American Society of Mechanical Engineers(ASME) Turbo Expo vol.2; 20040614-17; Vienna(AT) >PREPARATIONS FOR SMART SENSOR USAGE IN AIRCRAFT GAS TURBINE TESTING
【24h】

PREPARATIONS FOR SMART SENSOR USAGE IN AIRCRAFT GAS TURBINE TESTING

机译:在飞机燃气轮机测试中使用智能传感器的准备工作

获取原文
获取原文并翻译 | 示例

摘要

The preparation and planning process for smart sensor usage in aircraft gas turbine testing is described. The smart sensors are planned for usage in a process called Snap-In/ Snap-Out (SISO). The current instrumentation setup process for testing in an altitude test cell requires a multitude of aerodynamic pressure lines (up to 600 lines) and electrical cables for instrumentation measurement and excitation (up to 800 cables) be routed through patch panels to pressure scanners, power supply/signal conditioners, analog-to-digital (A/D) systems, and acquisition systems for processing, display, recording, analysis, and transmission of the data. The process is manpower intensive in both setup and configuration control. The SISO process will use smart sensors with calibrations and measurement information on the sensors plus consolidation of all sensor outputs before they exit the engine test stand; this configuration offers the opportunity to reduce the number of connections for measured data to one or at most a few wires. Measurement information stored with the sensor reduces the probability of configuring the instrumentation system incorrectly. The SISO process is presented here along with attendant cost reductions for instrumentation setup time, configuration management, and infrastructure maintenance. The discussion of planning activities includes certifying the smart sensor units for operation in the test cell environment, assessing the uncertainty of the sensor units, the schedule for implementation, and future requirements for smart sensors. Also discussed are the use of state-of-the-art smart sensors and legacy sensors, for several applications (pressure, temperature, position, and voltage) and for both transient and dynamic measurements.
机译:描述了在飞机燃气轮机测试中使用智能传感器的准备和计划过程。计划将智能传感器用于称为Snap / In / Snap-Out(SISO)的过程中。当前在海拔测试单元中进行测试的仪器设置过程需要多条气动压力线(最多600条线),用于仪器测量和激励的电缆(最多800条电缆)通过配线架布线到压力扫描仪,电源/信号调节器,模数(A / D)系统和用于处理,显示,记录,分析和传输数据的采集系统。该过程在设置和配置控制中都需要大量人力。 SISO流程将使用智能传感器以及传感器上的校准和测量信息,并在所有传感器输出离开发动机测试台之前对其进行合并;这种配置提供了将测量数据的连接数减少到一根或最多几根线的机会。与传感器一起存储的测量信息降低了错误配置仪器系统的可能性。此处介绍了SISO流程,并减少了仪器安装时间,配置管理和基础架构维护的相关成本。计划活动的讨论包括认证智能传感器单元以在测试单元环境中运行,评估传感器单元的不确定性,实施时间表以及对智能传感器的未来要求。还讨论了将最新的智能传感器和传统传感器用于多种应用(压力,温度,位置和电压)以及瞬态和动态测量的用途。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号