【24h】

CAE DATA MANAGEMENT USING TRADITIONAL PDM SYSTEMS

机译:使用传统PDM系统进行CAE数据管理

获取原文
获取原文并翻译 | 示例

摘要

Over the past decade, Computer Aided Engineering (Simulation) has experienced explosive growth being a significant enabler for: 1. Validating product design 2. Providing low-cost methods for exploring a variety of product design alternatives 3. Optimizing parts for better service performance 4. Reducing dependence on physical testing 5. Reducing warranty costs 6. Achieving faster time to market This rapid growth in the number of simulations performed and the amount of data generated in the absence of any significant data and process management initiatives has led to considerable inefficiencies in the CAE domain. Many companies now recognize the need to manage their CAE process and data as well as their desire to leverage their existing PDM systems as the primary repositories of CAE data. Some major issues are: 1. There is a need for a PDM data model to support CAE 2. The CAE data model can be very complex 3. There is an immense variety of CAE applications and data types 4. Many CAE simulations require access to physical test data for input and correlation 5. Data management discipline is not typically part of the CAE culture today Despite the unique challenges posed by bringing PDM into the CAE world, the transition could occur faster than it has in the CAD world. This presentation will showcase an approach for managing CAE data in traditional PDM systems. Two working examples of CAE process automation software solutions integrated with CAD and PDM will be discussed. In particular, these applications will show how CAE users can leverage established PDM infrastructure and interact with EDS' Teamcenter/Enterprise, Teamcenter/Engineering and Dassault Systeme's SmarTeam through seamless integrations with their CAE systems.
机译:在过去的十年中,计算机辅助工程(模拟)取得了爆炸性的增长,成为以下方面的重要推动者:1.验证产品设计2.提供低成本的方法来探索各种产品设计替代方案3.优化零件以获得更好的服务性能4 。减少对物理测试的依赖5.降低保修成本6.缩短上市时间在没有任何重要数据和流程管理措施的情况下,执行的仿真数量和生成的数据量迅速增加,导致效率低下。 CAE域。现在,许多公司认识到需要管理其CAE流程和数据,并希望利用其现有的PDM系统作为CAE数据的主要存储库。一些主要问题是:1.需要支持CAE的PDM数据模型2. CAE数据模型可能非常复杂3. CAE应用程序和数据类型种类繁多4.许多CAE模拟都需要访问用于输入和关联的物理测试数据5.如今,数据管理学科已不再是CAE文化的一部分。尽管将PDM引入CAE领域带来了独特的挑战,但过渡过程可能比CAD领域发生的速度更快。本演讲将展示一种在传统PDM系统中管理CAE数据的方法。将讨论与CAD和PDM集成的CAE过程自动化软件解决方案的两个工作示例。尤其是,这些应用程序将展示CAE用户如何通过与他们的CAE系统无缝集成来利用已建立的PDM基础架构,并与EDS的Teamcenter / Enterprise,Teamcenter / Engineering和Dassault Systeme的SmarTeam进行交互。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号