In the German Prototype Spent Fuel Reprocessing Plant Karlsruhe (WAK, Fig. 1), reprocessingrnof nuclear fuel was stopped in late 1990 in accordance with the principal political decision tornabolish reprocessing on an industrialrnscale in Germany. The final decommissioningrntask is the "green meadow"rn(stage 3) after demolishing the buildingsrnand remediation of the site, which isrnscheduled for 2009.rnDuring 25 years of operation, 208 tonsrnof nuclear fuel with a burnup of up to 40rnGWd/t including MOX-fuel, have beenrnreprocessed in this plant.rnThe decommissioning and dismantlingrnwill be achieved in six steps taking intornaccount that some processing equipment can be dismantled before and the rest only after thernHigh Active Liquid Waste Concentrate (HAWC) has been vitrified approximately by mid ofrn2005.rnAfter the successful begining of the remote dismantling of the main process cells in March 2000rn/1/, the next remote dismantling project at the WAK was initiated April 2000 (Remote Dismantlingrnof the WAK High Active Waste Concentrate Storage Facilities).rnFive Medium Active Waste (MAW) storage tanks and four High Active Waste Concentratern(HAWC) storage tanks, located above ground in five heavy shielded cells adjacent to the mainrnprocess building, have to be dismantled. In total ~ 130 tons of concrete (from access openings)rnand ~ 120 tons of metal structures covering an overall activity of ~ 2,5 x E15 Bq have to berndismantled remotely with respect to radiation levels up to 2200 mSv/h.rnFirst licenses, constructions and commissioning of an auxiliary building for remote access to therntank cells is scheduled for 2002. Remote dismantling of five MAW storage tanks is scheduled forrn2004, remote dismantling of the four HAWC storage tanks is scheduled for 2005-2007.
机译:在德国原型乏燃料后处理厂卡尔斯鲁厄(WAK,图1)中,根据在德国以工业规模破坏后处理的主要政治决定,1990年底停止了对核燃料的后处理。最终的退役任务是拆除该场地的建筑物并进行整治后的“绿色草地”(第3阶段),该工作计划于2009年进行。在运营25年的过程中,208吨核燃料的燃尽量高达40rnGWd / t,包括MOX-考虑到某些处理设备可以在之前拆除,其余的只有在高活性废液浓缩液(HAWC)在玻璃中加热到2005年中期玻璃化之后,才能通过六个步骤完成退役和拆除。 2000年3月1日,成功地开始了主要工艺单元的远程拆解,下一个WAK的远程拆解项目于2000年4月启动(WAK高活性废物浓缩液存储设施的远程拆解)。rn 5中度活性废物(MAW)储罐和四个高活性废物浓缩池(HAWC),位于地面上方的五个重型屏蔽室中,与之相邻主要过程的建筑,必须拆除。总共需要〜130吨混凝土(从检修口)-以及〜120吨金属结构,覆盖的总活动量约为2.5 x E15 Bq,辐射水平最高可达2200 mSv / h。计划于2002年进行一栋辅助建筑物的建造和调试,以便远程访问therntank单元。计划于2004年进行远程拆除5个MAW储罐,并计划于2005-2007年间进行远程4个HAWC储罐的拆除。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号