首页> 外文会议>AITES-ITA 2001 World Tunnel Congress Vol.3, Jun 10-13, 2001, Milan, Italy >CONSTRUCTION OF THE EXPLORATORY GALLERY FOR TUNNEL VISNOVE-MARTIN
【24h】

CONSTRUCTION OF THE EXPLORATORY GALLERY FOR TUNNEL VISNOVE-MARTIN

机译:隧道维斯诺夫-马丁探索馆的建设

获取原文
获取原文并翻译 | 示例

摘要

A pilot tunnel is driven in the stage of detailed engineering - geological and hydrogeological investigation for the designed tunnel Visnove. Tunneling by the company Doprastav a.s. Bratislava started in november 1998. The pilot tunnel, driven by the NATM and TBM, cross the mountainous ridge Lucanska Mala Fatra characterized by a very coplex geological and tectonical structure. The tunneling meets serious problems in the zones of tectonic faults characterized by heterogeneous structure and concentrated groundwater inflows.
机译:在详细的工程阶段-设计的Visnove隧道的地质和水文地质调查阶段,将驱动试验隧道。 Doprastav公司的隧道。布拉迪斯拉发始于1998年11月。在NATM和TBM的推动下,试验性隧道横穿多山的Lucanska Mala Fatra山脊,其特征是地质和构造结构极为复杂。隧道在构造断层带以构造非均质和地下水集中为特征的区域遇到严重问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号