CONSTRUCTION OF OUME TUNNEL HAVING LARGE CROSS SECTION WITH DOUBLE-TIER STRUCTURE IN UNCONSOLIDATED GROUND

机译:疏松地面双层结构大断面OUME隧道施工

获取原文
获取原文并翻译 | 示例

摘要

The central section of Oume Tunnel, which has a maximum excavation cross section of 261m~2, is the first highway tunnel having a double-tier structure to be excavated by NATM in Japan. Various auxiliary construction methods were employed to control the effect of excavation on surrounding structures. As a result, surface settlement has been controlled to a maximum of 20mm at the stage of completion of upper half excavation, and horizontal jet grouting was shown to be extremely effective in settlement control.
机译:大梅隧道的中央部分最大开挖断面为261m〜2,是日本第一条采用双层结构开挖的高速公路隧道。采用各种辅助施工方法来控制开挖对周围结构的影响。结果,在上半部开挖完成的阶段,地面沉降已被控制在最大20mm,并且水平喷射注浆在沉降控制中被证明是非常有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号