首页> 外文会议>Airport facilities: innovations for the next century >Lusiville international airport parkikng structure-need to reality in 21 months
【24h】

Lusiville international airport parkikng structure-need to reality in 21 months

机译:路易斯维尔国际机场停车场结构需要在21个月内实现

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

When Southwest airlines added Louisville International Airport (SDF) to its system, it quickly became apparent that parking was inadequante at the Airport and three was an urgent need for additional parking. Thus evolved the development of a new 4,300-space multilevel parking s tructure adjacent to the terminal. The project included a new access roadway system, state-of-the-art revenue control system, parking entrance/exity plazas, and operations/security office. Also included were two pedestrian tunnels with moving walkways, new escalators at each tunnel, parallel baggage accessways with provision for baggage conveyors in each tunnel, and the provision for future overhead pedestrian bridges to the ticketing areas of the termainal.
机译:当西南航空公司将路易斯维尔国际机场(SDF)添加到其系统中时,很快就发现该机场的停车位不足,迫切需要增加三个停车位。因此,开发了毗邻码头的新的4,300个空间的多层停车结构。该项目包括一个新的通道系统,最新的收入控制系统,停车场入口/出口广场以及运营/安全办公室。还包括两条行人通道,行人通道,每条隧道都设有新的自动扶梯,平行的行李通道,每条通道中都设有行李输送机,以及将来通往终点站售票区的行人天桥。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号