Yu-Ji Gas Pipeline Project Contractor HSE Management

机译:裕济天然气管道工程承包商HSE管理

获取原文
获取原文并翻译 | 示例

摘要

Yulin-Jinan gas transmission pipeline project is another important gas pipeline projectrnconstructed by China Petroleum & Chemical Corporation, following Sichuan to Easternrngas transmission pipeline project, which is also a National "Eleventh Five-Year" keyrnproject. The number of construction contractor who took part in the Yulin-Jinan naturalrngas pipeline construction projects are more than 80, including exploration, blasting, thernlaying of pipelines, corrosion prevention, flaw detection and so on. Because individualrncontractor’s HSE concept are different greatly, HSE education and training are heavy,rnthe key content of the site safety monitoring is more, structure of project managementrnorganization is complex, construction period is long, the task of coordination with thernlocal government and people is difficult and so on. So HSE management of thernconstruction period contractor is the difficulty and focus of the project constructionrnsafety environmental protection. Therefore, the HSE management of contractors willrndirectly affect the company’s integrated HSE performance. This paper comparing thernmanagement system standards with project actuality and contractors’ actual condition,rnsets down a set of practical and operable management procedures and requirements,rnwhich has a significance for standardizing contractor management and improvingrnenterprise HSE performance.
机译:榆济济输气管道工程是继四川至东方输气管道工程之后,又是国家“十一五”重点建设工程,是中国石油化工股份有限公司建设的又一重要输气管道工程。参与榆林-济南天然气管道建设项目的建筑承包商有80​​多个,包括勘探,爆破,管道敷设,防腐,探伤等。由于个体承包商的HSE观念差异很大,HSE教育和培训内容繁重,现场安全监控的重点内容更多,项目管理的组织结构复杂,建设周期长,与当地政府和人民的协调任务艰巨,以此类推。因此,施工期承包商的HSE管理是工程施工安全环保的难点和重点。因此,承包商的HSE管理将直接影响公司的整体HSE绩效。本文将管理体系标准与项目现状和承包商的实际情况进行了比较,确定了一套切实可行的管理程序和要求,对规范承包商管理和提高企业的HSE绩效具有重要意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号