首页> 外文会议>WEFTEC 2011;Annual Water Environment Federation technical exhibition and conference >Maximizing Operations Efficiency for Wastewater Utilities: Consolidation Evaluation for the City of St. Petersburg
【24h】

Maximizing Operations Efficiency for Wastewater Utilities: Consolidation Evaluation for the City of St. Petersburg

机译:最大限度地提高污水处理厂的运营效率:圣彼得堡市的综合评估

获取原文
获取原文并翻译 | 示例

摘要

To maximize operations efficiency, the city of St. Petersburg, Florida, wanted to investigate thernfeasibility for reducing their current water reclamation facilities from four to three. The existingrnAlbert Whitted Water Reclamation Facility is the smallest and oldest of the city’s four waterrnreclamation facilities. Required capital expenditures at AWWRF include construction of a newrn26.5-million-liter (7.0-million-gallon) reject water storage tank, which would need to be locatedrnat a remote location. As an alternative to the additional costs that would be incurred to keeprnAWWRF in service, the city contracted with CDM to evaluate alternatives to the continuedrnoperations and maintenance of the aging facility. The objective of the evaluation was to providerna present-worth analysis based on marginal cost for keeping AWWRF in service, versus twornalternatives for flow diversion and treatment if the plant were taken out of service. The flowrndiversion alternatives included installing a master pump station in proximity to AWWRF andrnnew force main(s) that would discharge to the other treatment facilities.
机译:为了最大程度地提高运营效率,佛罗里达州圣彼得堡市希望研究将其现有的水回收设施从四个减少到三个的可行性。现有的阿尔伯特·惠特(Albert Whitted)水回收设施是该市四个水回收设施中最小,最古老的。 AWWRF所需的资本支出包括建造一个新的2650万升(700万加仑)的废水储罐,该储罐必须位于偏远地区。作为使AWWRF保持运转所可能产生的额外费用的替代方法,该市与CDM签订了合同,以评估对老化设施的持续运营和维护的替代方法。评估的目的是基于使AWWRF保持运行的边际成本提供提供者现值分析,如果工厂停运则采用两种替代方案进行分流和处理。分流的替代方案包括在AWWRF附近安装一个主泵站和一个将排放到其他处理设施的新的力管。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号